| công cụ tìm kiếm bảng dữ liệu linh kiện điện tử |
|
FN8808 bảng dữ liệu(PDF) 29 Page - Renesas Technology Corp |
|
|
|||||||||||||||||||||||||||||
FN8808 bảng dữ liệu(HTML) 29 Page - Renesas Technology Corp |
|
29 / 44 page ![]() ISL78227 FN8808 Rev.6.02 Page 29 of 43 Feb 28, 2025 Refer to Figure 57 for the selection of RBLANK resistor and tMINON time. A 5kΩ resistor is recommended as the minimum RBLANK resistor. Operation Initialization and Soft-Start Before converter initialization, the EN pin voltage must be higher than its rising threshold and the PVCC/VCC pin must be higher than the rising POR threshold. When these conditions are met, the controller begins initialization and soft-start. Figure 58 shows the ISL78227 internal start-up timing diagram from the power-up to soft-start. Assuming input voltage is applied to the VIN pin before t1 and VCC is connected to PVCC, as shown on Figure 58, the descriptions for start-up procedures are described as follows: t1 - t2: The enable comparator holds the ISL78227 in shutdown until the VEN rises above 1.2V (typical) at the time of t1. During t1 - t2, VPVCC/VCC gradually increases and reaches the internal Power-On Reset (POR) rising threshold 4.5V (typical) at t2. t2 - t3: During t2 - t3, the ISL78227 self-calibrates to detect certain pin configurations (HIC/LATCH, DE/PHDRP, ATRK/DTRAK) to latch in the selected operation modes. The time duration for t2 - t3 is typically 195µs. t3 - t4: During this period, the ISL78227 waits until the internal PLL circuits are locked to the preset oscillator frequency. When PLL locking is achieved at t4, the oscillator generates output at the CLK_OUT pin. The time duration for t3 - t4 depends on the PLLCOMP pin configuration. The PLL is compensated with a series resistor-capacitor (RPLL and CPLL1) from the PLLCOMP pin to GND and a capacitor (CPLL2) from PLLCOMP to GND. At the 300kHz switching frequency, typical values are RPLL = 3.24kΩ, CPLL1 = 6.8nF, and CPLL2 = 1nF. With this PLLCOMP compensation, the time duration for t3 - t4 is around 0.7ms. t4 - t5: During this period, the PLL locks the frequency t4 and the system prepares to soft-start. The ISL78227 has one unique feature to pre-bias the SS pin voltage to be equal to VFB during t4 - t5, which is around 50µs. t5 - t6: At t5, the soft-start ramps up at the SS pin (VSSPIN) and the COMP voltage starts to ramp up as well. Drivers are enabled but not switching during t5 - t6 because the COMP is still below the current sense ramp offset. The device operates in diode emulation mode during soft-start period t5 - t8. The slew rate of the SS ramp and the duration of t5 - t8 are determined by the capacitor used at the SS pin. t6 - t7: At t6, COMP is above the current sense ramp offset and the drivers start switching. Output voltage ramps up while FB voltage is following SS ramp during this soft-start period. At t7, output voltage reaches the regulation level and FB voltage reaches VREF_1.6V. t7 - t8: At this stage, SS continues ramping up until it reaches the SS clamp voltage (VSSPCLAMP) 3.47V at t8, indicating the SS pin ramp-up is completed. At t8, the ISL78227 generates an internal SS_DONE signal, which goes HIGH when both VSSPIN = VSSPCLAMP (3.47V) and VREF_TRK ≥ 0.3V (as shown in Figure 3 on page 7). This indicates the soft-start has completed. t8 - t9: After t8, a delay time of either 0.5ms or 100ms is inserted before the PGOOD pin is released HIGH at t9, depending on the selected mode (refer to Table 2 on page 33). 1. If the DE/PHDRP pin = VCC or FLOAT to have DE mode selected, the PGOOD rising delay from VSSPIN = VSSPCLAMP (3.47V) and VREF_TRK ≥0.3V to PGOOD rising is 0.5ms. 2. If the DE/PHDRP pin = GND to have CCM mode selected, the PGOOD rising delay from VSSPIN = VSSPCLAMP (3.47V) and VREF_TRK ≥0.3V to PGOOD rising is 100ms, during which period the device is transitioning from DE mode to CCM mode. The high-side gate UGx is controlled to gradually increase the ON-time to finally merge with CCM ON-time. This synchronous MOSFET “soft-ON” feature is unique and ensures smooth transition from DCM mode to CCM mode after soft-start completes. More importantly, this “SYNC FET soft-ON” function eliminates the large negative current, which often FIGURE 57. tMINON vs RBLANK 0 50 100 150 200 250 300 350 400 450 500 5 10 1520253035 4045 505560 6570 RBLANK (k) FIGURE 58. CIRCUIT INITIALIZATION AND SOFT-START EN 1.2V POR_R PVCC/VCC PLLCOMP CLKOUT LG UG COMP COMP_Ramp_Offset VFB SS t1 t2 t3 t4t5 t6 t7 t8 t9 PGOOD |
|
Link URL |
| Cho đến nay ALLDATASHEET có giúp ích cho doanh nghiệp của bạn hay không? [ DONATE ] |
Alldatasheet là | Quảng cáo | Liên lạc với chúng tôi | Chính sách bảo mật | Liên kết đến bảng dữ liệu | Trao đổi link | Tìm kiếm theo nhà sản xuất All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |