| công cụ tìm kiếm bảng dữ liệu linh kiện điện tử |
|
PCA9527DPZ bảng dữ liệu(PDF) 13 Page - NXP Semiconductors |
|
|
|||||||||||||||||||||||||||||
PCA9527DPZ bảng dữ liệu(HTML) 13 Page - NXP Semiconductors |
|
13 / 23 page ![]() NXP Semiconductors PCA9527 3-channel bidirectional bus extender for HDMI, I2C-bus and SMBus 10 Dynamic characteristics VCC = 2.7 V to 5.5 V; GND = 0 V; Tamb = -40 °C to +85 °C; unless otherwise specified.[1][2] Symbol Parameter Conditions Min Typ[3] Max Unit tPLH LOW to HIGH propagation delay port B to port A; Figure 15 [4] 70 115 350 ns tPHL HIGH to LOW propagation delay port B to port A; Figure 13 40 75 180 ns tTLH LOW to HIGH output transition time port A; Figure 13 20 155 280 ns tTHL HIGH to LOW output transition time port A; Figure 13 20 60 100 ns tPLH LOW to HIGH propagation delay port A to port B; Figure 14 [5] 125 175 310 ns tPHL HIGH to LOW propagation delay port A to port B; Figure 14 [5] 130 220 330 ns tTLH LOW to HIGH output transition time port B; Figure 14 80 130 260 ns tTHL HIGH to LOW output transition time port B; Figure 14 20 45 100 ns tPLH LOW to HIGH propagation delay CECA; Figure 16 40 110 250 ns tPHL HIGH to LOW propagation delay CECA; Figure 16 40 80 180 ns tTLH LOW to HIGH output transition time CECA; Figure 16 80 150 260 ns tTHL HIGH to LOW output transition time CECA; Figure 16 20 60 100 ns tsu set-up time EN HIGH before START condition [6] 200 - - μs th hold time EN HIGH after STOP condition [6] 200 - - ns VCC(A) power-down to active; EN HIGH and VCC(B) on; VCC(A) ramping up [7] 200 - - μs trec(pd-act) recovery time from power-down to active VCC(B) power-down to active; EN HIGH and VCC(A) on; VCC(B) ramping up [8] 200 - - μs Table 7. Dynamic characteristics [1] Times are specified with loads of 1.35 kΩ pull-up resistance and 57 pF load capacitance on port B, and 450 Ω pull-up resistance and 57 pF load capacitance on port A. Different load resistance and capacitance will alter the RC time constant, thereby changing the propagation delay and transition times. [2] Pull-up voltages are VCC(A) on port A and VCC(B) on port B. [3] Typical values were measured with VCC(A) = 3.3 V at Tamb = 25 °C, unless otherwise noted. [4] The tPLH delay data from port B to port A is measured at 0.5 V on port B to 0.3VCC(A) on port A. [5] The proportional delay data from port A to port B is measured at 0.3VCC(A) on port A to 0.3VCC(B) on port B. [6] The enable pin, EN, should only change state when the global bus and the repeater port are in an idle state. [7] If the VCC(A) ramp up is fast, then the trec(pd-act) time must be allowed before the inputs are switched. If the supply ramp up is slow, the channels may be connected even before the final supply voltage is reached. [8] If the VCC(B) ramp up is fast, then the trec(pd-act) time must be allowed before the inputs are switched. If the supply ramp up is slow, the channels may be connected even before the final supply voltage is reached. PCA9527 All information provided in this document is subject to legal disclaimers. © NXP B.V. 2021. All rights reserved. Product data sheet Rev. 1.1 — 20 August 2021 13 / 23 |
|
|
Link URL |
| Cho đến nay ALLDATASHEET có giúp ích cho doanh nghiệp của bạn hay không? [ DONATE ] |
Alldatasheet là | Quảng cáo | Liên lạc với chúng tôi | Chính sách bảo mật | Liên kết đến bảng dữ liệu | Trao đổi link | Tìm kiếm theo nhà sản xuất All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |