công cụ tìm kiếm bảng dữ liệu linh kiện điện tử
  Vietnamese  ▼
ALLDATASHEET.VN

X  

CFC2000B bảng dữ liệu(PDF) 9 Page - Clarke International

tên linh kiện CFC2000B
Giải thích chi tiết về linh kiện  2 TONNE FOLDING CRANE
PDF  12 Pages
Scroll/Zoom Zoom In 100%  Zoom Out
nhà sản xuất  CLARKE [Clarke International]
Trang chủ  https://www.clarkeinternational.com/
Logo CLARKE - Clarke International

CFC2000B bảng dữ liệu(HTML) 9 Page - Clarke International

Back Button CFC2000B Datasheet HTML 4Page - Clarke International CFC2000B Datasheet HTML 5Page - Clarke International CFC2000B Datasheet HTML 6Page - Clarke International CFC2000B Datasheet HTML 7Page - Clarke International CFC2000B Datasheet HTML 8Page - Clarke International CFC2000B Datasheet HTML 9Page - Clarke International CFC2000B Datasheet HTML 10Page - Clarke International CFC2000B Datasheet HTML 11Page - Clarke International CFC2000B Datasheet HTML 12Page - Clarke International  
Zoom Inzoom in Zoom Outzoom out
 9 / 12 page
background image
9
Parts & Service: 020 8988 7400 / E-mail: Parts@clarkeinternational.com or Service@clarkeinternational.com
PURGING THE HYDRAULIC SYSTEM
During transit or storage it is possible that an air pocket may have developed within
the hydraulic ram and the ram action may therefore appear to be ‘spongy’. As the ram
is self bleeding, any air will be dispelled and the ram action normalised by fully raising
and lowering the jib a few times.
Should the jib not reach its full height, the oil level should be checked as described in
the Maintenance section.
STORAGE & MAINTENANCE
STORAGE
1. ALWAYS store the crane with the jib in its lowest position. This prevents any
possibility of corrosion to the ram.
2. DO NOT leave the crane in the open or exposed to the elements. Keep under
cover.
3. Remove the pin and slide the jib extension back to its shortest position. Replace
the pin and R-clip to secure the jib extension.
4. Release the control valve to lower the jib assembly to its lowest position.
5. Store the pump handle in its bracket on the side of the main support post.
6. Fold the unit in an upright position by
removing the front pins from the base and
raising the front legs to a vertical position.
Insert the locking pins into the L-brackets to
secure.
7. Replace the front pins into the holes in the
base.
MAINTENANCE
1. The crane should be inspected periodically by
a competent person with load bearing bolts
should being removed and inspected for
wear, deformation or cracks. If any are
apparent the bolt should be renewed.
2. Check the hydraulic ram operation and
inspect for oil leaks. A slight dampness on the
ram is normal, but where leakage is
apparent, the ram seals must eventually be
renewed and the lost oil be replaced. Consult
your CLARKE service department.



Html Pages

1 2 3 4 5 6 7 8 9 10 11 12


bảng dữ liệu tải về

Go To PDF Page


Link URL



Cho đến nay ALLDATASHEET có giúp ích cho doanh nghiệp của bạn hay không?  [ DONATE ] 

Alldatasheet là   |   Quảng cáo   |   Liên lạc với chúng tôi   |   Chính sách bảo mật   |   Liên kết đến bảng dữ liệu    |   Trao đổi link   |   Tìm kiếm theo nhà sản xuất
All Rights Reserved©Alldatasheet.com


Mirror Sites
English : Alldatasheet.com  |   English : Alldatasheet.net  |   Chinese : Alldatasheetcn.com  |   German : Alldatasheetde.com  |   Japanese : Alldatasheet.jp
Russian : Alldatasheetru.com  |   Korean : Alldatasheet.co.kr  |   Spanish : Alldatasheet.es  |   French : Alldatasheet.fr  |   Italian : Alldatasheetit.com
Portuguese : Alldatasheetpt.com  |   Polish : Alldatasheet.pl  |   Vietnamese : Alldatasheet.vn
Indian : Alldatasheet.in  |   Mexican : Alldatasheet.com.mx  |   British : Alldatasheet.co.uk  |   New Zealand : Alldatasheet.co.nz
Family Site : ic2ic.com  |   icmetro.com