công cụ tìm kiếm bảng dữ liệu linh kiện điện tử
  Vietnamese  ▼
ALLDATASHEET.VN

X  

720XP-2RU bảng dữ liệu(PDF) 5 Page - Arista Networks, Inc

tên linh kiện 720XP-2RU
Giải thích chi tiết về linh kiện  720XP Series 2 RU Cognitive Campus Switches
PDF  34 Pages
Scroll/Zoom Zoom In 100%  Zoom Out
nhà sản xuất  ARISTA [Arista Networks, Inc]
Trang chủ  https://www.arista.com/en/
Logo ARISTA - Arista Networks, Inc

720XP-2RU bảng dữ liệu(HTML) 5 Page - Arista Networks, Inc

  720XP-2RU Datasheet HTML 1Page - Arista Networks, Inc 720XP-2RU Datasheet HTML 2Page - Arista Networks, Inc 720XP-2RU Datasheet HTML 3Page - Arista Networks, Inc 720XP-2RU Datasheet HTML 4Page - Arista Networks, Inc 720XP-2RU Datasheet HTML 5Page - Arista Networks, Inc 720XP-2RU Datasheet HTML 6Page - Arista Networks, Inc 720XP-2RU Datasheet HTML 7Page - Arista Networks, Inc 720XP-2RU Datasheet HTML 8Page - Arista Networks, Inc 720XP-2RU Datasheet HTML 9Page - Arista Networks, Inc Next Button
Zoom Inzoom in Zoom Outzoom out
 5 / 34 page
background image
Chapter
1
Overview
This chapter includes the following sections:
•
Scope
•
Receiving and Inspecting the Equipment
•
Installation Process
•
Safety Information
•
Obtaining Technical Assistance
•
Specifications
1.1
Scope
This guide is intended for properly trained service personnel and technicians who need to install the
following Arista Networks Cognitive Campus Switches:
CCS-720XP-96ZC2
Important:
Only qualified personnel should install, service, or replace this equipment.
Seul le personnel qualifié doit installer, service, ou remplacer cet équipement.
1.2
Receiving and Inspecting the Equipment
Upon receiving the switch, inspect the shipping boxes and record any external damage. Retain
packing materials if you suspect that part of the shipment is damaged; the carrier may need to inspect
them.
If the boxes were not damaged in transit, unpack them carefully. Ensure that you do not discard any
accessories that may be packaged in the same box as the main unit.
Inspect the packing list and confirm that you received all listed items. Compare the packing list with
your purchase order. Parts List provides a list of components included with the switch.
1.3
Installation Process
The following tasks are required to install and use the switch:
1. Select and prepare the installation site (Site Selection).
2. Assemble the installation tools (Tools and Parts Required for Installation).
3. Attach the mounting brackets (Attaching Mounting Brackets to the Chassis).
4. Install the switch in an equipment rack (Inserting the Switch into the Rack)
5. Connect the switch to the power source and network devices (Connecting Power Cables).
6. Configure the switch (Configuring the Switch).
Important:
1



Html Pages

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34


bảng dữ liệu tải về

Go To PDF Page


Link URL



Cho đến nay ALLDATASHEET có giúp ích cho doanh nghiệp của bạn hay không?  [ DONATE ] 

Alldatasheet là   |   Quảng cáo   |   Liên lạc với chúng tôi   |   Chính sách bảo mật   |   Liên kết đến bảng dữ liệu    |   Trao đổi link   |   Tìm kiếm theo nhà sản xuất
All Rights Reserved©Alldatasheet.com


Mirror Sites
English : Alldatasheet.com  |   English : Alldatasheet.net  |   Chinese : Alldatasheetcn.com  |   German : Alldatasheetde.com  |   Japanese : Alldatasheet.jp
Russian : Alldatasheetru.com  |   Korean : Alldatasheet.co.kr  |   Spanish : Alldatasheet.es  |   French : Alldatasheet.fr  |   Italian : Alldatasheetit.com
Portuguese : Alldatasheetpt.com  |   Polish : Alldatasheet.pl  |   Vietnamese : Alldatasheet.vn
Indian : Alldatasheet.in  |   Mexican : Alldatasheet.com.mx  |   British : Alldatasheet.co.uk  |   New Zealand : Alldatasheet.co.nz
Family Site : ic2ic.com  |   icmetro.com