| công cụ tìm kiếm bảng dữ liệu linh kiện điện tử |
|
OL2385SWUG bảng dữ liệu(PDF) 54 Page - NXP Semiconductors |
|
|
|||||||||||||||||||||||||||||
OL2385SWUG bảng dữ liệu(HTML) 54 Page - NXP Semiconductors |
|
54 / 64 page ![]() NXP Semiconductors OL2385SWUG SIGFOX software driver OL2385SWUG All information provided in this document is subject to legal disclaimers. © NXP B.V. 2018. All rights reserved. User guide Rev. 2.1 — 6 April 2018 54 / 64 This means that the signal will be high (–80 dBm power level) during 9.990 s and low 10 ms (total duration 10 s). When executing this test with the device, it should be able to transmit the first frame and second frame only. According to the LBT concept, after frame 1 has been successfully transmitted, frame 2 and frame 3 have combined a total of only 8 s to find a free channel and get transmitted. In this test setup as frame 2 will find a free channel and gets transmitted, the duration of 8 s will be over by it getting transmitted and therefore frame 3 does not have time left to get transmitted. According to the timing diagram below, because we have no time left after frame 2 transmission, successful transmission of frame 3 should not take place. Figure 38. LBT test - Only frames 1, 2 pass Steps for LBT testing: 1. Press the reset button on the KL43Z to start from the beginning. (optional) 2. Choose Send Wake up: Type 1, and then press Enter. (This step is optional and not required if the device has not had a recent reset or it is already awake) 3. Take an RCZ3 board and choose the region Change to RCZ3: Type 17, and then press Enter. This will program the opening center frequencies of RCZ3 region into the OL2385. 4. Prepare any one of your test signals as per the explanation in the previous sections (frequency, power level, test signal) on the vector signal generator. Connect the signal generator RF output to RF input of the OL2385 based device. 5. Turn on the signal by ticking on the check mark on the block RF-A mod on the signal generator. 6. Choose Send payload: Type 4, and then press Enter; type a payload length up to 12 bytes, and then press Enter; type payload hex bytes and press Enter. 7. Check the SPI RX buffer bytes on the terminal. If test setup 1 or 3 was used, the second byte should be 0. If test setup 2 was used, second byte should be 0x3Bu. Detailed level of proof can only be checked using breakpoints inside the code to track transmitted frame numbers. 7.3.6 Receiver sensitivity testing (Test mode 3) This test is also referred to as RX sensitivity test, which aims to check that your end product has no issue in the RX path and is able to demodulate at 600 bps GFSK. This is mentioned in the test document UNBT Test plan (PTP_UNBT_production.pdf located at nxp.com/OM2385). This test can be useful when one does not have SFXIQ SIGFOX certification tool to check the sensitivity. The test includes activating the OL2385 receiver at the center RX frequency of a region by invoking the test mode 3 via SPI command and then monitoring on an extra terminal program for the pass/fail criteria of frames and their measured RSSI level. The frames are also needed to be sent on the set RX center |
|
Link URL |
| Cho đến nay ALLDATASHEET có giúp ích cho doanh nghiệp của bạn hay không? [ DONATE ] |
Alldatasheet là | Quảng cáo | Liên lạc với chúng tôi | Chính sách bảo mật | Liên kết đến bảng dữ liệu | Trao đổi link | Tìm kiếm theo nhà sản xuất All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |