| công cụ tìm kiếm bảng dữ liệu linh kiện điện tử |
|
MPC8280 bảng dữ liệu(PDF) 264 Page - Freescale Semiconductor, Inc |
|
|
|||||||||||||||||||||||||||||
MPC8280 bảng dữ liệu(HTML) 264 Page - Freescale Semiconductor, Inc |
|
264 / 1386 page ![]() 60x Signals MPC8280 PowerQUICC II Family Reference Manual, Rev. 1 7-6 Freescale Semiconductor request if the transfer attributes TT[0–4] indicate that a data tenure is required for the transaction. Negated—Has no special meaning during a normal transaction. Timing Comments Assertion/Negation—Driven and asserted on the cycle after a qualified BG is accepted by MPC8280; remains asserted for one clock only. Negated for the remainder of the address tenure. Assertion is coincident with the first clock that ABB is asserted. High Impedance—Occurs the cycle following the assertion of AACK (same cycle as ABB negation). 7.2.2.2 Transfer Start (TS)—Input Following are the state meaning and timing comments for the TS input signal. State Meaning Asserted—Indicates that another device has begun a bus transaction and that the address bus and transfer attribute signals are valid for snooping. Negated—Has no special meaning. Timing Comments Assertion/Negation—Must be asserted for one cycle only and then immediately negated. Assertion may occur at any time during the assertion of ABB. 7.2.3 Address Transfer Signals In internal only mode the memory controller uses these signals for glueless address transfers to memory and I/O devices. The address transfer signals are used to transmit the address. 7.2.3.1 Address Bus (A[0–31]) The address bus (A[0–31]) consists of 32 signals that are both input and output signals. 7.2.3.1.1 Address Bus (A[0–31])—Output Following are the state meaning and timing comments for the A[0–31] output signals. State Meaning Content—Specifies the physical address of the bus transaction. For burst or extended operations, the address is a double-word. Timing Comments Assertion/Negation—Driven valid on the same cycle that TS is driven/asserted; remains driven/valid for the duration of the address tenure. High Impedance— Occurs the cycle following the assertion of AACK; no precharge action performed on release. |
|
Link URL |
| Cho đến nay ALLDATASHEET có giúp ích cho doanh nghiệp của bạn hay không? [ DONATE ] |
Alldatasheet là | Quảng cáo | Liên lạc với chúng tôi | Chính sách bảo mật | Liên kết đến bảng dữ liệu | Trao đổi link | Tìm kiếm theo nhà sản xuất All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |