| công cụ tìm kiếm bảng dữ liệu linh kiện điện tử |
|
MB39C601 bảng dữ liệu(PDF) 19 Page - Cypress Semiconductor |
|
|
|||||||||||||||||||||||||||||
MB39C601 bảng dữ liệu(HTML) 19 Page - Cypress Semiconductor |
|
19 / 37 page ![]() Document Number: 002-08393 Rev.*A Page 19 of 37 MB39C601 8.9 TZE Part MB39C601 requires all of the following three conditions in order to start the next switching cycle. 1. The time since the last turn-on edge must be equal to or longer than the switching time set by IFB. 2. The time since the last turn-on edge must be longer than the minimum switching period set by MB39C601 (nominally 7.5µs which equals 133 kHz). 3. Immediately after zero energy detection at the TZE pin. Or, the time since the last zero energy detection must be longer than tWAIT, (TZE) (2.4μs or less). Starting switching cycle diagram The TZE pin is connected with Auxiliary Winding of the transformer through the resistance division, and detects zero energy as shown "TZE pin Connection". A delay, 50ns to 200ns, can be added with CTZE to adjust the turn-on of the primary switch with the resonant bottom of Primarty Winding waveform. Switching Waveform at detecting zero Energy |
|
Link URL |
| Cho đến nay ALLDATASHEET có giúp ích cho doanh nghiệp của bạn hay không? [ DONATE ] |
Alldatasheet là | Quảng cáo | Liên lạc với chúng tôi | Chính sách bảo mật | Liên kết đến bảng dữ liệu | Trao đổi link | Tìm kiếm theo nhà sản xuất All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |