| công cụ tìm kiếm bảng dữ liệu linh kiện điện tử |
|
TPS2306 bảng dữ liệu(PDF) 21 Page - Texas Instruments |
|
|
|||||||||||||||||||||||||||||
TPS2306 bảng dữ liệu(HTML) 21 Page - Texas Instruments |
|
21 / 28 page ![]() TPS2306 DUAL SEQUENCING HOT SWAP POWER MANAGER SLVS368 – APRIL 2001 21 POST OFFICE BOX 655303 • DALLAS, TEXAS 75265 APPLICATION INFORMATION R1B + 0.65 V (2.5 V * 0.65 V) 10k W ^ 3.51 kW estimating the output ramp-up time As described in the Fault Timer section, TPS2306 operation in linear mode is limited to the timeout period established by the external capacitor on the CT pin. This timeout must be long enough to allow for either the concurrent or sequential charging of BOTH outputs to the input supply levels. Therefore, an estimate of this ramp-up time is required to ensure start-up. The output voltage ramp profiles are influenced by a number of factors, including the amount of load capacitance, the load current level, the load characteristic (either resistive or constant-current), and the current ramp profile. Therefore, determination of the charging, or start-up, time is organized into several different load categories: 1. resistive loads, no soft-start 2. constant-current loads, no soft-start 3. constant-current loads, with soft-start The case which most closely describes the application characteristics should be selected. NOTE:In the following discussion, the subscripted “1” and “2” suffixes refer respectively to the first channel to ramp up (primary or master), and the second (or controlled or slave) channel to ramp, not necessarily device Channels 1 and 2. case 1: resistive loads, no soft-start When the output ramp conditions are met, the pass FET gates are initially only driven to source a current of approximately 5% of the IMAX current to the loads, as described in the Output Ramp Operation section. This first step lasts a nominal 500 µs. Subsequently, the output current is ramped to the full IMAX setting. For typical applications, the extent of capacitance charging during this slow ramp period is relatively small. Therefore, it can be neglected in estimating total start-up time, simplifying calculations. However, since the HSPM timer is started as soon as the first output starts ramping, the slow ramp period is included as a component of the total ramp-up time. Given these considerations, the start-time calculation approximates the source as making a step change from 0 to IMAX, once enabled. Therefore, the time for either output to charge to a given voltage, vx(t), can be found from: t + R Lx C Lx n (IMAXx) R Lx IMAXx R Lx * nx (t) ) t SR where: • R Lx = the load resistance • C Lx = the load input capacitance (CLOAD1 or CLOAD2 in Figure 2) • t SR = the initial slow turn-on period, approximately 500 µs (15) (16) |
|
Link URL |
| Cho đến nay ALLDATASHEET có giúp ích cho doanh nghiệp của bạn hay không? [ DONATE ] |
Alldatasheet là | Quảng cáo | Liên lạc với chúng tôi | Chính sách bảo mật | Liên kết đến bảng dữ liệu | Trao đổi link | Tìm kiếm theo nhà sản xuất All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |