| công cụ tìm kiếm bảng dữ liệu linh kiện điện tử |
|
PS50 bảng dữ liệu(PDF) 10 Page - Clarke International |
|
|
|||||||||||||||||||||||||||||
PS50 bảng dữ liệu(HTML) 10 Page - Clarke International |
|
10 / 24 page ![]() 10 Parts & Service: 020 8988 7400 / E-mail: Parts@clarkeinternational.com or Service@clarkeinternational.com OPERATION PRIME THE PUMP The pump must be primed before use. 1. Before starting the engine, remove the filler cap from the pump chamber. 2. Fill the pump chamber and inlet hose with water. NOTE: A foot valve (not supplied) connected to the lower end of the inlet hose between the hose and the strainer will help to maintain priming, 3. Replace the filler cap and tighten it securely. WARNING: WHEN YOU OPERATE THE PUMP, THE EXHAUST MUFFLER WILL BE VERY HOT. WARNING: DO NOT OPERATE THE ENGINE IN A CLOSED SPACE, MAKE SURE THAT THERE IS SUFFICIENT AIRFLOW AROUND THE PUMP DUE TO HARMFUL EMMISSIONS/ FUMES FROM THE ENGINE. WARNING: OPERATING THE PUMP DRY WILL DESTROY THE PUMP SEAL. IF THE PUMP IS OPERATED DRY, STOP THE ENGINE IMMEDIATELY AND LET THE PUMP COOL BEFORE PRIMING |
|
|
Link URL |
| Cho đến nay ALLDATASHEET có giúp ích cho doanh nghiệp của bạn hay không? [ DONATE ] |
Alldatasheet là | Quảng cáo | Liên lạc với chúng tôi | Chính sách bảo mật | Liên kết đến bảng dữ liệu | Trao đổi link | Tìm kiếm theo nhà sản xuất All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |